Trafford Academy
CM Oxendale Ltd carried out the design and installation of a new boiler plant to the school, works included replacement of existing boilers, pumps and water heaters.
A Total of 102 radiators were replaced with new LST models.
New BMS works to the systems, including network checking to existing Out-stations.
The radiator replacement works were carried out over the 6 week holidays, with the boiler plant replacement carried out during term time.