CM Oxendale Ltd carried out the design and installation of a new boiler plant to the school, works included replacement of existing boilers, pumps and water heaters.
New BMS works to the systems, including network checking to existing Out-stations.
The works were carried out within Term time, with shut downs carried out over a 1 week holiday, meaning the school was able to operate fully through-out the works.